香港黄色片-日日夜夜av-亚洲精品福利视频-99视频免费在线观看-久久久黄色片-麻豆精品一区二区三区视频-激情小说在线观看-国产ts系列-欧美中字-久久久伊人网-亚洲精品美女视频-久久色图-黄色美女一级片-成人在线天堂-国产人人爱-人妻精油按摩bd高清中文字幕-国产精品一二三四五区-99久久精品日本一区二区免费-少妇被爆操-秋霞午夜网-国产又爽又色-黄色污污视频网站-饥渴的熟妇张开腿呻吟视频-日韩人妻精品在线-欧美亚一区二区-国产三级国产精品国产专区50-亚洲国产资源-青娱乐极品美女-久久人人艹-亚洲国产一区二区波多野结衣

Contact Us

Industrial Ventilation Fan tips

Date: 2014-10-13   Click: 1778 Times

Before "Industrial Ventilation Fan" installation
1, the fan should be checked before installing it is intact, fastener bolts are loose or fall off, if collisions impeller cover. Carefully check the fan or blinds during transport without deformation damage.
2, the installation select export environment, you should pay attention to the socket can not have too much ~ ~ face obstacles in 2.5-3M's.
When "Industrial Ventilation Fan" installation
A smooth installation: the installation should pay attention to the horizontal position of the fan, the fan and mounting the motor to adjust to a solid foundation can not have tilted horizontal plane.
2, the fan should be installed so that the motor in position adjustment bolts, easy to operate. Adjust the belt tension when convenient to use.
3, when installing the fan bracket, be sure to let stand firm and level ground plane, reinstall the angle iron reinforcement if necessary, the next fan.
4, after installing the fan, check the tightness around. If this gap is, the available solar panels sealed plastic or glass.
After installation "Industrial Ventilation Fan"
1, after the installation is complete, check the internal fan to stay estate tools and debris. Hand or toggle lever blades, check whether tight or collision phenomenon, whether the project did not interfere with the rotation of the test run before the exception.
2, in operation, if there is vibration or fan motors have "buzz" abnormal sounds or other anomalies, should stop to check, repair, and then get started.

Back to: Industry news

+86-0769-83660708

Home Product News Contact